Stuart well Services Ltd

Tel: +44 (0) 1953 454540

Fax: +44 (0) 1953 456968

part of the Stuart group

Dewatering

dewatering

Dewatering is used on civil engineering and construction projects to enable excavations to go below the groundwater level.
Dewatering involves the temporary lowering of groundwater level to below an excavation level or depressurisation of groundwater pressures to enable an excavation to be undertaken in stable ground conditions.
Other commonly used terms are Construction Dewatering or Groundwater Control. Stuart Well Services Limited offers a one-stop service for the design, installation and provision of Dewatering Systems.

  • Design of Dewatering Systems
  • Installation & Commissioning
  • Hire and/or Sale of Dewatering System
  • Ongoing Management and Monitoring

Why Dewater?

dewatering

Dewatering can generate soil stability, the removal of groundwater or reducing porewater pressures from a saturated soil matrix will increase the effective stress of the soil.

Excavations become unstable and fluidisation or boiling or quick sand conditions will occur were the upward hydraulic gradient exceeds a critical value. The base of an excavation will become unstable if vertical effective stress approaches zero. Dewatering is used to reduce hydraulic gradient and generate stable soil conditions.

Basal heave will occur when an excavation is made in low permeable soils (Clay) which has an underlying confined aquifer, where there is insufficient weight + any shear stress of its sides in the plug of low permeable soil to counter up flow forces. Resulting in heave and occasionally piping of groundwater. Dewatering used to reduce porewater pressures in confining aquifer to below critical level or below excavation level.

Go Top
Stuart Group Ltd © 2017 All Rights Reserved.
Terms & ConditionsCookie LawHealth & SafetyEnvironmental & SustainabilityCHAS AccreditationQualityContactSite Map